Thane Metro Line 4: Trial Runs Signal a New Era of Connectivity

Thane's metro dream gathers pace, promising faster, easier journeys across the city.

Get Details

Metro Line 4 Trial Run Begins: What It Means for Thane West

For years, Thane's residents have watched pillars rise along Ghodbunder Road, waiting patiently for the promise of a metro to become reality. That wait moved decisively closer to its end when the Mumbai Metropolitan Region Development Authority conducted the technical inspection and trial run of Metro Line 4 and 4A's priority section, a moment officials and commuters alike are calling historic. The Mumbai Metropolitan Region Development Authority successfully conducted the technical inspection and trial run of Metro Line 4 and 4A's priority section, marking a significant step towards launching Thane's first metro line.

The trial covered a modest but meaningful stretch. The trial run covered a 4.4-kilometre stretch between Gaimukh and Vijay Garden, passing through four newly constructed stations: Gaimukh, Govaniwada, Kasarvadavali, and Vijay Garden. This segment forms part of a far larger vision for the region. This segment is part of the first phase of the expansive Metro Line 4/4A corridor, eventually extending to a total length of 35.20 km with 32 stations.

The project's rollout has been carefully phased to bring relief to commuters in stages rather than all at once. Phase-1, stretching from Gaimukh to Cadbury Junction, covers 10.5 kilometers and includes 10 stations, and is expected to be fully operational by April 2026, with four stations ready for use by December 2025. The subsequent stretches follow close behind, with Phase-2 running from Cadbury to Gandhi Nagar targeted for October 2026, and Phase-3 connecting Gandhi Nagar to Wadala expected by October 2027.

What makes this corridor particularly significant is its eventual integration with the wider Mumbai network. Metro Line 4, running from Wadala to Kasarsvadavali, along with its extension Metro Line 4A up to Gaimukh, will be connected to Metro Line 11 extending to Chhatrapati Shivaji Maharaj Terminus, creating a 58-kilometer corridor, the longest in the country. Speaking at the flag-off, the state's leadership underscored the scale of ambition behind the project. Deputy Chief Minister and MMRDA Chairman Eknath Shinde said the project would play a crucial role in resolving Thane's persistent traffic congestion. Chief Minister Devendra Fadnavis went further, setting an ambitious deadline for the network. Chief Minister Devendra Fadnavis announced that all phases of the Mumbai Metro will be operational for passengers by the end of 2026.

The infrastructure groundwork behind the trial run reflects months of steady construction. Infrastructure including viaducts, tracks, and overhead equipment has already been completed. Engineers left little to chance during the inspection itself. As part of the trial run, the Commissioner of Metro Rail Safety carried out a technical review to ensure all systems were ready.

For homebuyers and residents along Ghodbunder Road, Kolshet, Manpada, and the broader Thane West belt, this is more than an engineering milestone; it is a signal that the daily grind of arterial road traffic may soon ease considerably. Localities that have long been prized for their greenery and relative calm, yet penalised by congested road access to Mumbai's business districts, stand to gain the most as stations near Kasarvadavali and Vijay Garden come alive. Established developers with long-standing residential communities in this corridor, including Oberoi Realty's Forestville in Kolshet and the sprawling Oberoi Garden City on Pokhran Road, are among the projects positioned to benefit as commute times shrink and the area's appeal broadens to a wider base of Mumbai-bound professionals.

Historically, metro announcements in the Mumbai Metropolitan Region have preceded gradual but steady upticks in residential interest along the corridor, as buyers price in future convenience well before the first train actually runs. With CM Fadnavis reiterating that all phases of the Mumbai Metro will be operational for passengers by the end of 2026, Thane West's residential micro-markets are likely to see this trial run cited often in the months ahead, both by developers highlighting proximity and by buyers weighing the long-term convenience of a home in this rapidly transforming part of the city.

For now, the message from Thane's civic and transport authorities is one of measured optimism. The tracks are laid, the trains have moved, and the safety checks are underway. What remains is the wait for commercial operations, a wait that, if timelines hold, should end well within the current year for the earliest stretch of stations.

Project

OBEROI Projects

Oberoi Juhu Tara Road
Acquisition

Oberoi Juhu Tara Road

Juhu, Mumbai

To Be Announced • Price on Request

1.85-acre sea-facing redevelopment

Oberoi Versova Andheri West
Acquisition

Oberoi Versova Andheri West

Versova, Andheri West, Mumbai

To be announced • Price on Request

17.18 lakh sq ft MHADA redevelopment

Oberoi Malabar Hill Redevelopment
Upcoming

Oberoi Malabar Hill Redevelopment

Malabar Hill, Mumbai

3, 4 BHK • Price on request

Cluster redevelopment on Mumbai's most prestigious hill

Aman Branded Residences, Worli
Pre-Launch

Aman Branded Residences, Worli

Worli, Mumbai

Ultra-luxury residences • Price on request

India's first Aman-branded residences

Oberoi Adarsh Nagar, Worli
Pre-Launch

Oberoi Adarsh Nagar, Worli

Worli, Mumbai

3, 4 BHK • Price on Request

MHADA redevelopment on Worli Seaface

Oberoi Bandra East
Pre-Launch

Oberoi Bandra East

Bandra East, Mumbai

To be announced • Price on request

11-acre railway land, 19.5 lakh sq ft FSI

Oberoi Bandra Reclamation
Pre-Launch

Oberoi Bandra Reclamation

Bandra Reclamation, Mumbai

2, 3, 4 BHK • Price on Request

Sea Link-facing luxury on a 2.5-acre parcel

Oberoi Business Square, GIFT City
Pre-Launch

Oberoi Business Square, GIFT City

GIFT City, Ahmedabad

Office Spaces, Retail • Price on Request

Premium IFSC business address

Enquire Now

Interested in this project?

Fill in your details and our team will get back to you shortly with pricing, availability, and more.

Your Details

Back

Common Questions

What is Thane Metro Line 4 and where does it run?
Metro Line 4 connects Wadala in Mumbai to Kasarvadavali in Thane, with its extension Line 4A running further to Gaimukh. Together they form a 35.20 km corridor with 32 stations.
When did the trial run begin on Metro Line 4?
MMRDA conducted the technical inspection and trial run on the priority section between Gaimukh and Vijay Garden, covering a 4.4-km stretch through four newly built stations.
When will Thane Metro Line 4 become operational for the public?
Phase-1 from Gaimukh to Cadbury Junction is expected to be fully operational by April 2026, with a few stations opening earlier by December 2025. Later phases are targeted for October 2026 and October 2027.
How will Metro Line 4 change connectivity for Thane West?
Once operational, it will link congested pockets like Ghodbunder Road, Kasarvadavali, and Kolshet directly to Mumbai's business districts via an eventual 58-km integrated corridor with Metro Line 11, easing dependence on road transport.
Will Metro Line 4 impact property prices in Thane West?
Improved connectivity typically drives sustained buyer interest and gradual price appreciation in areas near upcoming metro stations, as commute convenience becomes a bigger factor for Mumbai-bound homebuyers choosing Thane.
Which areas of Thane will benefit most from this metro line?
Localities along the Ghodbunder Road belt, including Kasarvadavali, Kolshet, Manpada, and Pokhran Road, are expected to see the most direct connectivity gains as new stations open in these stretches.
Is Metro Line 4 connected to other metro lines in Mumbai?
Yes, Line 4 and its extension 4A will connect with Metro Line 11, which extends to Chhatrapati Shivaji Maharaj Terminus, forming one continuous long-distance corridor for commuters.
Does Oberoi Realty have projects near the Metro Line 4 corridor?
Oberoi Realty has an established presence in Thane West with projects such as Forestville in Kolshet and Oberoi Garden City on Pokhran Road, both located within the broader catchment of the upcoming metro network.
Who is executing the Metro Line 4 project?
The project is being developed by the Mumbai Metropolitan Region Development Authority (MMRDA), with technical safety oversight from the Commissioner of Metro Rail Safety during trial runs.
What is the total cost of the Metro Line 4 and 4A project?
The corridor involves an investment of approximately Rs 16,000 crore, covering elevated viaducts, stations, rolling stock, and a dedicated depot supporting multiple metro lines in the region.

The information here is shared in good faith for guidance alone and forms no part of any agreement. All figures, layouts, and images are subject to revision. Please confirm every detail with an authorised representative before proceeding. About · Projects