The Road That Will Rewrite Goregaon-Mulund's Story

A ₹14,000-crore tunnel-and-flyover corridor is set to turn a 90-minute crawl into a 25-minute drive.

Get Details

Goregaon-Mulund Link Road: The ₹14,000-Crore Corridor Reshaping East-West Mumbai

For anyone who has ever sat in traffic between Goregaon and Mulund, the idea of a 25-minute commute might sound like fiction. Yet that is precisely the promise of the Goregaon-Mulund Link Road (GMLR), a project the Brihanmumbai Municipal Corporation describes as one of the city's most transformative infrastructure undertakings. The Goregaon Mulund Link Road is one of Mumbai's most ambitious infrastructure projects, with a 12.2-km, Rs 14,000 crore corridor of tunnels, flyovers and interchanges that promises to finally bridge the gap between the city's western and eastern suburbs.

The pain point GMLR is built to solve is a familiar one for anyone who has tried to cross the city east to west. Right now, traveling from Goregaon to Mulund during peak hours can take up to 90 minutes, but once the GMLR is ready, the journey is expected to shrink to just 25 minutes. That kind of compression does not just save time on a commute; it fundamentally changes how two suburbs relate to each other. As one industry blog put it, a commute that currently takes 75 minutes will drop to about 25 minutes, and that's not incremental improvement, that's a structural shift in how Mumbai's western and eastern suburbs relate to each other.

What makes GMLR different from Mumbai's earlier east-west attempts is its engineering ambition. It's a 12.2 km multi-modal infrastructure project that includes flyovers, a 6.3 km twin tunnel bored under Sanjay Gandhi National Park, and integration points with the Metro 2A network, connecting the Western Express Highway near Goregaon directly to the Eastern Express Highway at Mulund. On the ground, the tunnelling work has entered a decisive phase. The most technically complex component, the twin tunnels beneath SGNP, has entered an active phase, with launching shafts at Goregaon fully excavated and massive Tunnel Boring Machines being lowered into position using an 800-metric-ton crane.

The project's timeline is being executed in stages rather than as one giant reveal. The first flyover on the Goregaon side, the 1.3-kilometre stretch from Dindoshi Court to the Ratnagiri Hotel junction, is on track for completion, while the eastern end's 1.89-kilometre Mulund flyover package, which includes a 120-metre cable-stayed structure at Dr Hedgewar Chowk, is scheduled for completion by mid-2027. The tunnels themselves remain the long pole in the schedule: boring is expected to commence in 2026, with tunnel work targeted for completion by late 2028, and the entire corridor projected to become fully operational by 2028-2029. Civic budgeting backs up the intent behind these deadlines, with Rs 1,958 crore allocated in the BMC's 2025-26 budget specifically for this project signalling an unambiguous financial commitment from the city.

Why does a road matter so much to homebuyers? Because Mumbai's growth pattern has always been lopsided. Mumbai has historically expanded along its north-south rail corridors, with the local train network ensuring that suburbs like Andheri, Borivali, and Thane developed rapidly along these lines, while east-west connectivity has remained a persistent urban planning gap. GMLR becomes only the fourth serious attempt to close that gap; it is Mumbai's fourth east-west corridor, after Ghodbunder Road, JVLR, and SCLR. Once functional, it is expected to relieve pressure on the other three, which today carry far more traffic than they were designed for.

The symbolism of the project was not lost on its inauguration. When ground was broken on the tunnel phase, Prime Minister Narendra Modi, laying the foundation stone for the third phase of GMLR, said "Zyada se zyada connectivity, utna hi tez vikas" — the more the connectivity, the faster the development. For residents and investors around Goregaon and Mulund, that line captures exactly why this corridor is being watched so closely.

Oberoi Realty's own footprint sits squarely in the corridor's zone of influence. In Mulund West, Oberoi Enigma by Oberoi Realty offers a residential experience that stands to benefit directly once the eastern flyover and tunnel exit open up faster access to Goregaon, Malad and the Western Express Highway. On the Goregaon side, the developer's Oberoi Garden City campus in Goregaon East — home to phases like Elysian, Esquire and Exquisite — sits close to the very stretch where the first GMLR flyover, from Dindoshi Court, is taking shape, putting these addresses on the frontline of the corridor's earliest gains.

For homebuyers weighing a decision today, the practical takeaway is timing. The first flyover segment is expected to open well before the tunnels, meaning partial relief on the Goregaon side could arrive years ahead of full corridor completion. Buyers evaluating homes near either end of GMLR would do well to track phase-wise progress rather than waiting for the entire 12.2-km stretch to open, since even partial connectivity has historically nudged demand and pricing in Mumbai's infrastructure-linked micro-markets.

Project

OBEROI Projects

OBEROI BANDRA RLDA
Acquisition

OBEROI BANDRA RLDA

Bandra East, Mumbai

To be announced • Pricing on request

11-acre railway land, ₹5,400 Cr bid, next to BKC

Oberoi Juhu Tara Road
Acquisition

Oberoi Juhu Tara Road

Juhu, Mumbai

To Be Announced • Price on Request

1.85-acre sea-facing redevelopment

Oberoi Versova Andheri West
Acquisition

Oberoi Versova Andheri West

Versova, Andheri West, Mumbai

To be announced • Price on Request

17.18 lakh sq ft MHADA redevelopment

Oberoi Malabar Hill Redevelopment
Upcoming

Oberoi Malabar Hill Redevelopment

Malabar Hill, Mumbai

3, 4 BHK • Price on request

Cluster redevelopment on Mumbai's most prestigious hill

Aman Branded Residences, Worli
Pre-Launch

Aman Branded Residences, Worli

Worli, Mumbai

Ultra-luxury residences • Price on request

India's first Aman-branded residences

Oberoi Adarsh Nagar, Worli
Pre-Launch

Oberoi Adarsh Nagar, Worli

Worli, Mumbai

3, 4 BHK • Price on Request

MHADA redevelopment on Worli Seaface

Oberoi Bandra East
Pre-Launch

Oberoi Bandra East

Bandra East, Mumbai

To be announced • Price on request

11-acre railway land, 19.5 lakh sq ft FSI

Oberoi Bandra Reclamation
Pre-Launch

Oberoi Bandra Reclamation

Bandra Reclamation, Mumbai

2, 3, 4 BHK • Price on Request

Sea Link-facing luxury on a 2.5-acre parcel

Enquire Now

Interested in this project?

Fill in your details and our team will get back to you shortly with pricing, availability, and more.

Your Details

Back

Common Questions

What exactly is the Goregaon-Mulund Link Road (GMLR)?
GMLR is a 12.2-km road corridor being built by the BMC to directly connect the Western Express Highway at Goregaon with the Eastern Express Highway at Mulund. It includes flyovers, approach roads, and twin tunnels bored under Sanjay Gandhi National Park, at an estimated cost of Rs 14,000 crore.
How much will GMLR reduce the Goregaon-Mulund commute?
Current peak-hour travel between the two suburbs can take 75 to 90 minutes. Once GMLR is fully operational, this is expected to drop to around 20-25 minutes, a reduction of nearly an hour on a daily commute.
When will GMLR be completed?
The project is being rolled out in phases. The first Goregaon-side flyover is targeted for mid-2026, the Mulund flyover package by mid-2027, the SGNP tunnels by late 2028, and the entire corridor is expected to be fully operational by 2028-2029.
Why does GMLR need tunnels under Sanjay Gandhi National Park?
Since the shortest route between Goregaon and Mulund passes through SGNP's protected forest land, the BMC opted for underground twin tunnels rather than a surface road, minimising disruption to the park's ecology, wildlife, and tribal settlements.
How does GMLR compare to other east-west links in Mumbai?
GMLR will be Mumbai's fourth major east-west corridor after Ghodbunder Road, the Jogeshwari-Vikhroli Link Road (JVLR), and the Santacruz-Chembur Link Road (SCLR). It is expected to ease congestion on these existing, heavily used routes.
Which Oberoi Realty projects benefit most from GMLR?
Oberoi Enigma in Mulund West and the Oberoi Garden City cluster in Goregaon East are the developer's addresses closest to the corridor's two ends, positioning both for improved cross-suburb access once respective phases open.
Has construction actually started, or is this still on paper?
Construction is well underway. Launching shafts for the tunnel boring machines have been excavated at Goregaon, TBM assembly is in progress, and flyover segments on both the Goregaon and Mulund sides are under active construction.
Will GMLR increase property prices in Goregaon and Mulund?
Real estate experts widely expect improved connectivity to boost demand and pricing in both micro-markets, as has historically happened along Mumbai's other link roads once they became operational.
Is any land acquisition needed for this project?
According to civic officials, no land acquisition is required for the tunnel sections since they run entirely underground beneath the national park, which has also helped limit displacement-related delays.
Who is funding and executing the GMLR project?
The project is being executed by the Brihanmumbai Municipal Corporation (BMC) and was inaugurated for its tunnel phase by Prime Minister Narendra Modi in July 2024, with dedicated budget allocations made in successive BMC annual budgets.

The information here is shared in good faith for guidance alone and forms no part of any agreement. All figures, layouts, and images are subject to revision. Please confirm every detail with an authorised representative before proceeding. About · Projects